Most viewed - Pilbara negative and digital Albums - Iron Ore |

243-13397 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

080304 2202397 viewsThomas Yard, 21 km post looking north, long rake of waggons being run up and down the mainline to keep the wheels turning. 4th March 2008.
|
|

110620 2274397 viewsChapman, FMG TK type fuel tank waggon TK 10 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

251-03397 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5508 awaits its fate. Rebuilt in 1987 at Goninan's Welshpool factory from 1969 AE Goodwin built ALCo C636 with serial number G6041-2 and road number 5466 and assigned new serial number 4839-04 / 87-073. It was delivered in Mt Newman Mining orange and was named Fortescue. It also carried the marigold and teal version of the Australia map as part of the BHP logo. In 2003 it was fully rebuilt and leased to Pilbara Rail in that livery and numbered 5052. It survives stored at 7 mile complex as at Dec 2021. 22nd April 2000.
|
|

226-02396 viewsYule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.
|
|

226-28396 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
|
|

227-03396 viewsNelson Point, view along A and B berths from Shiploader 2, Shiploader 1 on B berth, reclaimers 3 and 4 visible behind the under harbour tunnel feed conveyor. GeoData.
|
|

227-08396 viewsNelson Point, view along the rear of A and B berths from Shiploader 2, salt pile on the left, then the under harbour tunnel portal, old reclaimers 3 and 4 with the crushing building in the distance, which has now been demolished, and the rear of Shiploader 1 on B berth. GeoData.
|
|

229-00396 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
|
|

230-34396 viewsYandi Two balloon loop, mid-train remote units Goninan GE CM40-8M rebuilds from different ALCo builders. 5657 'Fukuyama' serial 8412-02/94-148 is from Comeng ALCo M636 unit 5492 while 5639 'Corunna Downs' serial 8281-03/92-128 is from an AE Goodwin ALCo C636 unit 5459. Note the marker lights on 5657 and the sheet metal windscreen protectors to prevent the blown ore pitting the screens. Geodata -22.718338, 119.039909 .
|
|

231-28396 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h, note the missing logo from the hood and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
|
|

232-30396 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
|
|

234-09396 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of engine hood and fuel tank. Circa 1998.
|
|

040805 095744396 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.
|
|

050412 0768396 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA waggon 523, originally in ore service before conversion to a ballast waggon.
|
|

050518 2201396 viewsBing Siding. Rear 3/4 view of ballast train and of 1963 built Magor USA waggon 536, originally in ore service before conversion to a ballast waggon.
|
|

050522 2739396 viewsGoldsworthy Junction, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich Qld in September 1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

050525 2952396 viewsMooka Siding, rail recovery and transport train flat waggon #18, 6012, built by Scotts of Ipswich Qld in September 1970, view of number board and rail support structure.
|
|

050625 3820396 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, some Barclay Mowlem track machines are off clear of the running lines, a sleeper crane is at the front with three sleeper inserters behind. 25th June 2005.
|
|

050917 5506396 viewsCoon Siding, on the truncated passing siding following a derailment Switch Tamper SW 02 is a Plasser Australia model Unimat S4 switch tamper. 17th September 2005.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
96 |  |
 |
 |
 |
 |
 |
 |
|