Most viewed - Pilbara negative and digital Albums - Iron Ore |

060501 3929430 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. 1st May 2006.
|
|

6214 Gemco WA 080621 2724430 viewsTabba South, view from rear of new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
|
|

0016 Comeng WA 110411 10027430 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
|
|

0207 CNR - QRRS China 150620 9329430 viewsQuarry 8 ballast loading area, rake of CNR-QRRS of China built 99 tonne ballast waggons with the Difco USA built long and short side dump waggons with a Dash 8 loco on the rear.
|
|

170729 0163430 viewsFortescue River Bridge on the Robe River line at the 115.8 km, a loaded Deepdale train heading for Cape Lambert behind the standard motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 run over the largest rail bridge in the Pilbara. 29th July 2017. GeoData.
|
|

060723 7834430 viewsRio Tinto compressor waggon set CB 02, compressor control waggon with two diesel powered Atlas Copco XAS 97's and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here inside 7 Mile. 23rd July 2006.
|
|

02396 080116 1383430 viewsChapman Siding, builders plate on FMG waggon 2396, CSR Zhuzhou Rolling Stock Works, year of 2007 and month 10 for October.
|
|

248-09430 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 7077 serial 47756 from the original first order in the Pepsi Can livery and 9408 serial 54158 from the fourth order in the Pilbara Rail livery with Robe ownership markings. The signal marker boards are in the distance. Approximate location. 24th April 2004.
|
|

249-01430 viewsYule River road crossing on the former Hedland - Wittenoom Road in flood after Tropical Cyclone John in December 1999. Approximate location.
|
|

250-22430 viewsCape Lambert South Yard and Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper as yard expansion works are underway to the left. 22nd October 2000.
|
|

255-26430 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade as it heads to Mesa J for loading behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 with serial number 6266-08 / 89-85 and sisters 9410, 9420 and 9414. Geodata location here. May 2002.
|
|

268-12430 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

283-23430 viewsHarding Siding, Robe River's Goninan GE rebuild CM40-8M unit 9414 serial number 8206-11 / 91-124 leads the typical quad power with 9420, 9410 and 9425 as they run along the loop road as part of the bedding down process. 9414 was rebuilt from AE Goodwin built M636 ALCo model with original serial number G-6060-5 from 1971. Wednesday 22nd May 2002.
|
|

222-35429 viewsSomewhere on the original single line section between Gull and Rosella a pair of Hamersley Iron General Electric Dash 9-44CW's built by GE at Erie power a loaded train towards Dampier from the passing track back onto the mainline following a crew change.
|
|

224-26429 viewsBing siding, the afternoon empty to Yandi waits in the loop as a loaded behind two Goninan rebuilt CM40-8M GE units rolls through on the mainline, 5637 'De Grey' serial 8181-01 / 92-123 trails sister unit 5642 'Wallareenya'. GeoData.
|
|

225-01429 viewsWalla siding area, the East Turner River is in flood, flowing with the bridge at the 55.5 km in the background.
|
|

227-34429 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. Toyota tray back. GeoData.
|
|

230-20429 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The ore stockpile and pedestal stacker are visible. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|

238-07429 viewsPort Hedland Harbour, heavy lift ship Happy Buccaneer (IMO: 8300389) sits at Finucane Island D Berth delivering a new shiploader for BHP Billiton. 1st November 2003. Geodata . Back in time here the ship cranes were only 550 tonne each, these are now 700.
|
|

Sundowner EG Budd USA 040912 142134429 viewsNelson Point, Silver Star observation coach, 'Sundowner', 3/4 view from rear end. Originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
96 |  |
 |
 |
 |
 |
 |
 |
|