Most viewed - Pilbara negative and digital Albums - Iron Ore |

160128 00339105 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0031, class leader of a second batch delivered in 2015 with safety slogan 'Safety - It's your life'.
|
|

170728 09688105 viewsRio Tinto compressor waggon set CB 12, receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

171018 0957105 viewsTad Yard, overview of Roy Hill's fuel tanks and waggon loading gantry with a fuel train being loaded headed up by ES44ACi unit RHA 1020 serial number 64301 and sister units RHA 1015 serial number 63826 with RHA 1017 serial number 63828 awaiting their next call to duty. All three RHA units were built in Erie Pennsylvania, USA by General Electric. 17th October 2018.
|
|

243-09105 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan trails CM40-8M unit 5634 both in the new 'earth' or 'bubble' livery as they head up an empty train waiting departure time. August 2003.
|
|

080124 1622105 viewsChapman Siding, view of the hand brake end with F type Interlock coupling, uncoupling lever and hand brake wheel arrangement, control waggon 2256, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

110620 2261105 viewsChapman, a loaded train of Chinese built ore waggons by CSR Zhuzhou Rolling Stock Works loaded with lump ore. 20th June 2011.
|
|

110620 2272105 viewsChapman, FMG TK type fuel tank waggon TK 12 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as the final member of a order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

221-25104 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
|
|

225-04104 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach behind General Electric AC6000 6074 serial 51066 built by GE at Erie. Flashbutt yard is to the right. GeoData.
|
|

226-19104 viewsShaw North, 216.5 km, departure repeater signal post SWN 4R for the mainline is aimed across the 700 metre radius curve that north bound trains face. GeoData.
|
|

226-24104 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.
|
|

226-34104 viewsShaw siding 219 km, 5656 'Keihin' serial 8412-01 / 94-147 is the lead or controlling remote on the mid-train pair of units, the vinyl windscreen protectors are fitted to the windscreens, note the large flat fuel tank indicating these two units were Comeng NSW built ALCo's. GeoData.
|
|

227-05104 viewsNelson Point, view along B berth with Shiploader 1, this loader has since been replaced. In the distance now are berths E and F, Redbank Powerstation can be seen in the distance. GeoData.
|
|

227-18104 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
|
|

227-37104 viewsNelson Point, tug boat Warilla, 50 ton bollard pull Z-Peller type, built by Tamar Steel Boats in Launceston in 1982, pulls a loaded carrier clear of B berth as a sister vessel Warang passes behind.
|
|

228-02104 viewsNoranda, Perth, a Sigma sedan after running up the arse of my HJ75 Landcruiser. Only damage to the ute was a numberplate!
|
|

229-23104 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|

232-22104 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
|
|

232-27104 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
|
|

233-35104 viewsYandi Two balloon loop, new United Goninan WA built iron ore waggon 4157, delivered in March 1997 as part of a batch of 126 waggons made from 3CR12 steel with tapered floors. GeoData.
|
|
3977 files on 199 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
97 |  |
 |
 |
 |
 |
 |
 |
|