Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

0220


220-03.jpg

BHP GML line, Taplin Siding and Ruben Junction, loaded train with C36-7M.
Goldsworthy Junction empty train with CM40-8M.

35 files, last one added on Dec 26, 2014
Album viewed 294 times

0221


221-21.jpg

Continuation of Album 0207.
Yarrie line, Hardie Siding with Dash 7 5513 and Dash 8 5669 crossing.
BHP Yandi One loadout with new AC6000 locomotive 6074.
August 1999.

37 files, last one added on Sep 19, 2015
Album viewed 281 times

0222


222-09.jpg

BHP at the 105 km crossing.
Green Tank Pool.
Hamersley Iron Dash 9 driver changeover at Lizard Siding.

37 files, last one added on Oct 26, 2015
Album viewed 260 times

0223


223-35.jpg

Hamersley Iron rail grinder and C44-9W units 7082 and 7072 with a loaded and 7082 and 7080 on an empty at Possum Siding 225-229 km on the Tom Price line.
21st October 2000.

36 files, last one added on Oct 25, 2015
Album viewed 263 times

0224


224-08.jpg

AC6000 class run an empty train out of Bing Siding, 6076, 6073 and midtain unit 6075, following a cross with a loaded headed up by the old standard of two pairs of double Dash 8 units.

37 files, last one added on Oct 27, 2015
Album viewed 214 times

0225


225-10.jpg

BHP Dash 8 5669 light engine at Bing.
Empty train with double AC6000 6074, 6075 and AC6000 6073 mid-train.

30 files, last one added on Oct 28, 2015
Album viewed 125 times

0226


226-16.jpg

Yule River bridge repaired sections.
Garden and Shaw siding details and signal details.
Loaded train at Redmont Airstrip, double Dash 8.
Rail grinder at Shaw, loaded train at Shaw, double Dash 8.

37 files, last one added on Nov 13, 2015
Album viewed 126 times

0227


227-10.jpg

BHP Nelson Point berths.
Cargill Salt pile.
Empty train 5649, 5651, 6070, 5659 and 5641.
25 km signal site.

37 files, last one added on Nov 13, 2015
Album viewed 119 times

0228


228-33.jpg

Yandi 2 loaded train departing.
Empty train arriving.
CM40-8M units 5667, 5649, 5644, 5669 and 5638.
Sunday 18th May, 1997.
GeoData is only approximate.

38 files, last one added on Nov 13, 2015
Album viewed 123 times

0229


229-30.jpg

Empty train arriving at Yandi 2 and through load-out.
CM40-8M units 5650, 5642, 5660 and 5657.
May 1997.
GeoData is only approximate.

35 files, last one added on Nov 13, 2015
Album viewed 116 times

0230


230-27.jpg

Empty train arriving at Yandi 2 and through load-out.
CM40-8M units 5654, 5637, 5657 and 5639.
June 1997.
GeoData is only approximate location.

38 files, last one added on Nov 13, 2015
Album viewed 125 times

0231


231-34.jpg

Yandi Two balloon loop, train being loaded with CM40-8M units 5652 and 5650.
GeoData is only approximate location.

38 files, last one added on Mar 21, 2016
Album viewed 115 times

0232


232-00.jpg

Yandi 2 views.
5665 cabless unit at Yandi 1.
5639 on a supply train at Yandi 1.

38 files, last one added on Mar 21, 2016
Album viewed 143 times

0233


233-06.jpg

Yandi 2, train being loaded. CM40-8M units 5650, 5634.

37 files, last one added on Mar 21, 2016
Album viewed 114 times

0234


234-32.jpg

Yandi 2, loaded train, CM40-8M units 5640, 5658 and CM39-8 unit 5630.

37 files, last one added on Mar 21, 2016
Album viewed 122 times

0235


235-14.jpg

Yandi 2, empty train arrives.
Yandi 1 loaded train.

37 files, last one added on Mar 21, 2016
Album viewed 124 times

48 albums on 3 page(s) 2

Random files - Pilbara negative and digital Albums - Iron Ore
080116_1365.jpg
080116 13654 viewsChapman Siding at the 69 km on FMG's under construction line to Cloud Break mine, new waggons stabled in the passing track awaiting service, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007, here slave waggon 1395 and master waggon 2396 sit in the arvo sunlight. The yellow circle indicates the rotary coupler end and the tare weight of the slave waggon at 22.6 tonnes, while the master weighs 22.9 tonnes as it hosts the brake control equipment. 16th January 2008.
196-01.jpg
196-01179 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C unit 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
171018_0734.jpg
171018 073413 viewsRio Tinto compressor waggon set CB 15, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 18th October 2017.
225-29.jpg
225-2912 viewsBing siding backtrack, Tomlinson WA built GML ore waggon 8104 loaded with ballast, side view. GeoData.

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2021 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional