Pilbara Railways Scanned and Digital Image Showcase

The entire photo collection with the Toad's Scans images scanned from negatives and slides onto today's digital images


Home Login
Album list Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

0222


222-02.jpg

BHP at the 105 km crossing.
Green Tank Pool.
Hamersley Iron Dash 9 driver changeover at Lizard Siding.

37 files, last one added on Oct 26, 2015
Album viewed 202 times

0223


223-16.jpg

Hamersley Iron rail grinder and C44-9W units 7082 and 7072 with a loaded and 7082 and 7080 on an empty at Possum Siding 225-229 km on the Tom Price line.
21st October 2000.

36 files, last one added on Oct 25, 2015
Album viewed 196 times

0224


224-30.jpg

AC6000 class run an empty train out of Bing Siding, 6076, 6073 and midtain unit 6075, following a cross with a loaded headed up by the old standard of two pairs of double Dash 8 units.

37 files, last one added on Oct 27, 2015
Album viewed 170 times

0225


225-12.jpg

BHP Dash 8 5669 light engine at Bing.
Empty train with double AC6000 6074, 6075 and AC6000 6073 mid-train.

30 files, last one added on Oct 28, 2015
Album viewed 76 times

0226


226-16.jpg

Yule River bridge repaired sections.
Garden and Shaw siding details and signal details.
Loaded train at Redmont Airstrip, double Dash 8.
Rail grinder at Shaw, loaded train at Shaw, double Dash 8.

37 files, last one added on Nov 13, 2015
Album viewed 80 times

0227


227-20.jpg

BHP Nelson Point berths.
Cargill Salt pile.
Empty train 5649, 5651, 6070, 5659 and 5641.
25 km signal site.

37 files, last one added on Nov 13, 2015
Album viewed 71 times

0228


228-21.jpg

Yandi 2 loaded train departing.
Empty train arriving.
CM40-8M units 5667, 5649, 5644, 5669 and 5638.
Sunday 18th May, 1997.
GeoData is only approximate.

38 files, last one added on Nov 13, 2015
Album viewed 75 times

0229


229-03.jpg

Empty train arriving at Yandi 2 and through load-out.
CM40-8M units 5650, 5642, 5660 and 5657.
May 1997.
GeoData is only approximate.

35 files, last one added on Nov 13, 2015
Album viewed 73 times

0230


230-00.jpg

Empty train arriving at Yandi 2 and through load-out.
CM40-8M units 5654, 5637, 5657 and 5639.
June 1997.
GeoData is only approximate location.

38 files, last one added on Nov 13, 2015
Album viewed 78 times

0231


231-12.jpg

Yandi Two balloon loop, train being loaded with CM40-8M units 5652 and 5650.
GeoData is only approximate location.

38 files, last one added on Mar 21, 2016
Album viewed 65 times

0232


232-17.jpg

Yandi 2 views.
5665 cabless unit at Yandi 1.
5639 on a supply train at Yandi 1.

38 files, last one added on Mar 21, 2016
Album viewed 86 times

0233


233-30.jpg

37 files, last one added on Mar 21, 2016
Album viewed 69 times

0234


234-32.jpg

37 files, last one added on Mar 21, 2016
Album viewed 71 times

0235


235-11.jpg

37 files, last one added on Mar 21, 2016
Album viewed 73 times

0236


236-27.jpg

36 files, last one added on Apr 03, 2016
Album viewed 86 times

0238


238-16.jpg

Images of the Happy Buccaneer with shiploader. 1st Nov 2003.
SD40-2T loco at Nelson Point. 19th Nov 2003.
SD40-2 and SD40R locos at Nelson Point. 27th Jan 2004.

25 files, last one added on Apr 03, 2016
Album viewed 75 times

39 albums on 3 page(s) 2

Random files - Pilbara negative and digital Albums - Iron Ore
070908_0596.jpg
070908 05966 viewsRobe River compressor waggon set IC20 with air receiver and IC21 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 8th August 2007.
100717_0684.jpg
100717 06847 viewsFlash Butt yard, new rail stock carrier waggon 6037, built by Gemco Rail in late 2009-10 with Barber bogies.
040815_165832.jpg
040815 16583258 viewsNelson Point Car Dumper 3, a new Goninan built ore waggon 4239, one of 126 such waggons constructed during 1997 out of 3CR12Ti stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. Note the rounded bottom edge and tapered floor, this design was designated HC7081. 15th August 2004.
232-27.jpg
232-2711 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. GeoData.

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2019 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional