|

256-01183 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-02168 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-03176 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-04190 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-05170 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.
|
|

256-06189 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.
|
|

256-07180 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.
|
|

256-08196 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-09187 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-10184 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-11187 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-12203 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-13181 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-14180 views89.6 km, Toyota Landcruiser HJ75, waiting for a train. May 2002.
|
|

256-15178 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|

256-16224 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|

256-17207 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|

256-18172 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|

256-19189 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|

256-20184 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|
|