Most viewed - 0256 |

256-13115 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-25115 viewsMaitland Siding, Robe River CM40-8M unit 9422 on an empty train. 9422 was built by Comeng NSW as an ALCo M636 model in August 1977 with serial C6103-2 and delivered to Robe River in November 1977. 22nd February 1979 9422 was lead unit on empty train involved in head on collision at Siding One, it was repaired at Cape Lambert and returned to service. It was eventually rebuilt by Goninan in March 1993 to become an CM40-8M with serial number 8297-03 / 93-138. May 2002.
|
|

256-07114 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.
|
|

256-09114 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-20114 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|

256-29114 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
|
|

256-31114 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
|
|

256-32114 viewsAt the 89.6 km grade crossing the loaded train behind the quad CM40-8M working of 9414, 9420, 9410 and 9425 rolls across the crossing and heads down the 1.26 percent grade. May 2002.
|
|

256-18113 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|

256-23113 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train passes sister unit 9414 heading up a loaded train. May 2002.
|
|

256-37112 viewsAt the 89.6 km grade crossing the loaded Robe River waggons across the crossing. May 2002.
|
|

256-28111 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
|
|

256-30111 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
|
|

256-05110 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.
|
|

256-36107 viewsAt the 89.6 km grade crossing the loaded train behind the quad CM40-8M working of 9414, 9420, 9410 and 9425 rolls across the crossing and heads down the 1.26 percent grade. 9425 was built by AE Goodwin NSW as an ALCo C636 in April 1970 with serial G-6041-4 for Mount Newman Mining with road number 5468. It was sold to Robe in August 1982 and repainted and renumbered to 9425. 9425 was rebuilt by Goninan WA in August 1989 to become an CM40-8M model with serial 6266-8 / 89-85. May 2002.
|
|

256-02106 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-15106 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
|
|
|
|
|
|